The MasterFormat division list

Division numbers and titles as CSI publishes them, in CSI’s groups and subgroups. The 15 reserved numbers are listed too, in gray: they hold no sections today and keep room in the numbering for future expansion.

MasterFormat® is published by the Construction Specifications Institute (CSI) and Construction Specifications Canada (CSC). This page lists division numbers and titles only. For the sections inside each division, see the official publication at csiresources.org.

Showing 50 of 50 divisions

Procurement and Contracting Requirements Group

Division 00
DivisionTitle
00Procurement and Contracting Requirements

Specifications Group

General Requirements Subgroup

Division 01
DivisionTitle
01General Requirements

Facility Construction Subgroup

Divisions 02 to 19
DivisionTitle
02Existing Conditions
03Concrete
04Masonry
05Metals
06Wood, Plastics, and Composites
07Thermal and Moisture Protection
08Openings
09Finishes
10Specialties
11Equipment
12Furnishings
13Special Construction
14Conveying Equipment
15Reserved for Future Expansion
16Reserved for Future Expansion
17Reserved for Future Expansion
18Reserved for Future Expansion
19Reserved for Future Expansion

Facility Services Subgroup

Divisions 20 to 29
DivisionTitle
20Reserved for Future Expansion
21Fire Suppression
22Plumbing
23Heating, Ventilating, and Air Conditioning (HVAC)
24Reserved for Future Expansion
25Integrated Automation
26Electrical
27Communications
28Electronic Safety and Security
29Reserved for Future Expansion

Site and Infrastructure Subgroup

Divisions 30 to 39
DivisionTitle
30Reserved for Future Expansion
31Earthwork
32Exterior Improvements
33Utilities
34Transportation
35Waterway and Marine Construction
36Reserved for Future Expansion
37Reserved for Future Expansion
38Reserved for Future Expansion
39Reserved for Future Expansion

Process Equipment Subgroup

Divisions 40 to 49
DivisionTitle
40Process Interconnections
41Material Processing and Handling Equipment
42Process Heating, Cooling, and Drying Equipment
43Process Gas and Liquid Handling, Purification, and Storage Equipment
44Pollution and Waste Control Equipment
45Industry-Specific Manufacturing Equipment
46Water and Wastewater Equipment
47Reserved for Future Expansion
48Electrical Power Generation
49Reserved for Future Expansion

A note on Division 40: CSI’s 2026 overview page labels it Process Integration. CSI’s 2018 master list and the Division 40 page on The Construction Standard use Process Interconnections, the title shown here.

What MasterFormat is and what it is used for

CSI calls MasterFormat “the construction industry’s standardized language for project documentation.” It organizes construction information into work results, the work contractors price, procure and build, and every specification section carries a six digit number that starts with its two digit division.

Specifications

A project manual is organized by division and section, so anyone on the team can find the requirements for openings in Division 08 or finishes in Division 09 without reading the whole book.

Pricing and buying

Because the divisions follow the work contractors price and procure, estimates, bids and buyouts can be broken down the same way the specifications are.

Project records

Submittals and product data are usually filed by specification section number, which is why a submittal log starts with that number. Even the National CAD Standard files its floor plan symbols by MasterFormat number.

What changed in MasterFormat 2026

CSI calls the 2026 edition a significant update: it adds 2,185 new listings and reorganizes 617. According to CSI, this is where the changes land:

  • Largest changes. Division 32 (Exterior Improvements) gets a large expansion of site and landscape systems, and Division 34 (Transportation) is restructured for infrastructure classification. Together they account for more than 80% of the structural changes.
  • Noticeable expansion. Division 28 (Electronic Safety and Security) and Division 31 (Earthwork).
  • Maintenance updates, mainly title clarifications or small reorganizations: Divisions 01, 06, 09, 10 and 26.
  • Largely stable: Divisions 02, 07, 27 and 40.

CSI says the majority of the changed content stays in the same divisions, and its notes do not announce any new, removed or renamed division. The division titles on this page match CSI’s 2018 master list.

From 16 divisions to 50

MasterFormat had 16 divisions from the early 1960s until the 2004 edition, which expanded it to 50 (numbered 00 to 49) and moved to six digit section numbers. The last CSI edition with 16 divisions was published in 1995.

The biggest move was mechanical and electrical work. The old Division 15, Mechanical, was split into Divisions 21 (Fire Suppression), 22 (Plumbing) and 23 (HVAC). The old Division 16, Electrical, became Divisions 25 to 28, from Integrated Automation to Electronic Safety and Security. Numbers 15 and 16 are now reserved, so a spec that still says “Division 15” for mechanical work is using the pre 2004 system.

MasterFormat and UniFormat: the difference

MasterFormat organizes specifications into work results, the parts of the work that contractors price, procure and build. That is why it gives a project manual its structure, division by division and section by section.

UniFormat, also published by CSI and CSC, arranges the same building by functional elements, such as substructure, shell, interiors and services, without regard to the materials and methods used to build them. CSI names its primary use as a format for estimators to present cost estimates during schematic design. In short: UniFormat describes what each part of the building does, and MasterFormat describes the work that builds it.

Construction documents take people who know the system.

WorldTeams builds remote teams for US architecture, engineering and construction firms: vetted architects, drafters and BIM specialists who produce construction documents in your standards and your hours. If CD sets are piling up faster than your team can take them on, that is the conversation we have.

Questions, answered

What are the 50 divisions of CSI MasterFormat?

MasterFormat numbers its divisions from 00 to 49. Division 00 covers procurement and contracting requirements and Division 01 general requirements. Divisions 02 to 14 cover facility construction, from existing conditions and concrete to conveying equipment. Facility services run from 21 to 28, site and infrastructure from 31 to 35, and process equipment from 40 to 48. 15 numbers are reserved for future expansion, so 35 divisions are in use.

Ask AI

What happened to the old 16 divisions?

They were replaced in 2004, when MasterFormat expanded from 16 divisions to 50 and moved to six digit section numbers. The old Division 15, Mechanical, became Divisions 21 (Fire Suppression), 22 (Plumbing) and 23 (HVAC). The old Division 16, Electrical, became Divisions 25 to 28, from Integrated Automation to Electronic Safety and Security. Numbers 15 and 16 are now reserved for future expansion.

Ask AI

How many MasterFormat divisions are actually used?

35. MasterFormat numbers its divisions from 00 to 49, but 15 of those numbers are reserved for future expansion: 15 to 20, 24, 29, 30, 36 to 39, 47 and 49. CSI prints them in its master list as Reserved for Future Expansion, so they keep their place in the numbering even though they carry no work today. The other 35, from Procurement and Contracting Requirements to Electrical Power Generation, are the ones with sections in them.

Ask AI

What changed in MasterFormat 2026?

According to CSI, MasterFormat 2026 adds 2,185 new listings and reorganizes 617. Divisions 32 (Exterior Improvements) and 34 (Transportation) account for more than 80% of the structural changes, Divisions 28 and 31 grew noticeably, and Divisions 01, 06, 09, 10 and 26 got maintenance updates. CSI's notes do not announce any new, removed or renamed division, and the division titles match CSI's 2018 master list.

Ask AI

What is the difference between MasterFormat and UniFormat?

MasterFormat organizes construction information by work results, the work contractors price, procure and build, and it gives specifications their structure. UniFormat, also from CSI and CSC, organizes a building by functional elements such as substructure, shell, interiors and services, without naming materials or methods. CSI describes its primary use as presenting cost estimates during schematic design. In short, UniFormat describes what each part does and MasterFormat the work that builds it.

Ask AI

Where can I get the full list of MasterFormat sections?

From CSI. This page covers division numbers and titles only. The sections inside each division, with their numbers, titles and explanations, are in the official MasterFormat publication, which CSI licenses under its end user license agreement. CSI also asks anyone planning a commercial product or resource built on MasterFormat numbers or titles to contact CSI first.

Ask AI